Power Outages
Grid Alerts Before the Power Goes: What ERCOT, CAISO, PJM, and MISO Actually Tell You, and What to Do for Your Pets in Each Window
By EmergencyPetPrep Editorial · Updated
Short answer: A staged grid alert means reserves are low, not that your power is out. Use each stage to charge backup power, consolidate pet medication, and confirm a backup location before an outage actually happens.
Researched and written with AI assistance from the published sources listed at the end of this page. We are not veterinarians, no veterinarian has reviewed this page, and we do not test products by hand, so check those sources and talk to your own vet about your animal. How we work →
Read this first
Some pet emergencies outrun any checklist. If an animal is collapsing, struggling to breathe, or was exposed to something toxic, stop reading and call your veterinarian or the nearest emergency animal hospital now. When officials order an evacuation, go; nothing on this page is worth delaying your own exit. This article is spec-and-evidence analysis of published guidance, not veterinary care for your specific animal. Where your vet's instructions or an official order differ from anything here, they win.
Key takeaways
- A staged grid alert means reserves on the grid are getting thin. It is not an outage at your house, and the time between the alert and any outage is the time this page is about using.
- A Conservation Appeal is not an Energy Emergency Alert. ERCOT describes it as an earlier, voluntary request to cut use, and treats the numbered EEA levels as emergency operations.
- ERCOT's EEA 2 page says ERCOT is "using demand response to lower electric demand" as one of its grid actions. It is a grid-level action, and the page does not say your utility adjusts home thermostats. Ask your own utility about any residential program.
- PJM, MISO and CAISO also run staged alerts. PJM and MISO both used them during Winter Storm Fern in January 2026, so this is not only a Texas and California issue.
- Many households sit outside all four footprints. If you are not sure which grid operator covers you, check your own utility's outage or emergency-alert page.
Want it on paper? Get the free printable go-bag checklist.
A staged grid alert means the grid operator sees reserves getting thin. It does not mean your power is out. ERCOT, CAISO, PJM, and MISO each publish staged public alerts before a shortage becomes an outage, and every stage describes reserves on the grid, not power at your house. If a push alert or headline used the words “energy emergency” or “conservation appeal,” your lights are almost certainly still on. Use that window to charge backup power, gather pet medication, and confirm a place to go.
Two things are easy to mix up. A Conservation Appeal is not an Energy Emergency Alert (EEA). A Flex Alert does not mean a rolling blackout is coming. Each is its own product with its own trigger.
A grid alert is not the other power-outage situations
A staged grid alert is not an active outage. It is not a weeks-long restoration after the grid has failed (see our weeks-long outage pet plan), and it is not a utility deliberately de-energizing your lines for fire-weather reasons (see our PSPS pet countdown protocol). Our power-outage hub names all of these situations. This page covers the one that starts before the power goes.
Find out which alert system covers you
Each of four grid operators covers a different footprint. A threshold from the wrong operator says nothing about your risk.
- ERCOT is the grid operator for the ERCOT Interconnection, which NERC’s winter assessment describes as located entirely in Texas.
- CAISO, the California Independent System Operator, issues the California alerts described below.
- PJM coordinates the grid across, in its own words, “Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia.”
- MISO, the Midcontinent Independent System Operator, says it operates “across 15 states and the Canadian province of Manitoba.”
These four footprints do not add up to the whole country, and this page does not describe a nationwide grid-alert system. If you are not sure which operator covers you, or whether one does, check your own utility’s outage or emergency-alert page.
Texas: ERCOT’s four stages
ERCOT publishes a Conservation Appeal and then three escalating EEA levels. They have four separate thresholds, and the pet action changes at each. As of September 29, 2026, ERCOT’s pages described them as follows.
Conservation Appeal: the earliest, voluntary stage
ERCOT describes a Conservation Appeal as an elevated request for Texans to reduce energy use on peak-demand days when reserves are lower and emergency operations are possible. It is issued when demand approaches available supply, and the recommended action is to “reduce electric use, if safe to do so.” ERCOT’s page also says the appeal is only a voluntary request, and that anyone with medical needs should contact their local electric utility and have a backup plan in case controlled outages are needed later.
No emergency has been declared at this stage. It is the cheapest window to act in.
Pet action: charge your portable power station, top off a battery-backup aquarium air pump, and pre-cool or pre-heat the room where your temperature-sensitive pet spends the most time. Our pet power budget page has the runtime math for an aquarium heater, a reptile heat source, or a mini fridge holding pet medication. Our portable power stations for pets guide compares five stations on that basis.
EEA 1: the first declared emergency level
ERCOT declares an EEA 1 when operating reserves drop below 2,500 MW and are expected to stay below that level for at least 30 minutes. Its instruction is “Please safely reduce electric use during an EEA 1.” ERCOT’s energy-saving tips for this window include changing the thermostat a degree or two, turning off extra lights, and not running large appliances such as washers, dryers and dishwashers.
ERCOT has moved from asking to declaring, but an EEA 1 is not a promise of an outage.
Pet action: finish any charging you started at the Conservation Appeal. If you have a generator for a pet-dependent device, confirm it has fuel. Reread the caution on our generator sizing for pet loads page: a powered medical device should not run off a generator unless your veterinarian and the device’s manufacturer have signed off.
EEA 2: reserves not recovering, demand response engaged
ERCOT declares an EEA 2 when reserves have dropped below 2,000 MW and are not expected to recover within 30 minutes, or when frequency drops below 59.91 Hz for 15 minutes. ERCOT says “entering emergency operations does not mean that ERCOT is expecting to call for controlled power outages.” At this stage it describes activating all available generation, releasing remaining reserves, coordinating with other grid operators for out-of-state generation, and “using demand response to lower electric demand.”
ERCOT’s page lists demand response among ERCOT’s own grid actions and does not say what resources it calls on. It does not describe your utility adjusting your smart thermostat. This page does not cover residential demand-response programs; ask your own utility whether it offers one.
Pet action: consolidate any refrigerated pet medication so it is ready to move if the fridge loses power. Confirm a backup destination for a heat- or cold-sensitive pet if your home cannot hold temperature without power. Finish anything left on your list. The EEA 2 trigger is reserves not expected to recover within 30 minutes.
EEA 3: reserves critically low, controlled outages directed
ERCOT declares an EEA 3 when reserves drop below 1,500 MW, or when frequency drops below 59.8 Hz for any period of time. At this level ERCOT says it will direct transmission operators to reduce power through “controlled outages, which impact all customer classes, including residential, commercial, and industrial.” ERCOT’s page frames these as a last-resort measure to prevent a wider, uncontrolled failure.
Pet action: treat outages as imminent, not merely possible. Finish anything still undone rather than waiting for the power to go.
California: CAISO’s Flex Alert and EEA levels
CAISO’s ladder is structured differently. Its Emergency Notifications Fact Sheet (marked CommPR/08.2023) defines each level as follows. The fact sheet says CAISO moved to notifications that match the North American Electric Reliability Corporation’s (NERC) EEA system, so these levels sit inside the same NERC framework as ERCOT’s.
| CAISO level | What CAISO’s fact sheet says |
|---|---|
| EEA Watch | All available resources are committed or forecast to be in use, and energy deficiencies are expected. It can be issued the day before a projected shortfall or after a sudden event. Consumers are encouraged to conserve. |
| EEA 1 | Real-time analysis shows all resources in use or committed, and energy deficiencies are expected. Consumers are encouraged to conserve. |
| EEA 2 | The ISO requests emergency energy from all resources and has activated emergency energy programs. Consumers are urged to conserve to help preserve grid reliability. |
| EEA 3, preparing for rotating outages | The operator cannot meet minimum reliability reserve requirements and has declared the initial step of an EEA 3. Utilities are alerted to prepare, but rotating outages have not been ordered. |
| EEA 3, ordering rotating outages | The operator has ordered utilities to begin rotating outages because supply is not sufficient to meet demand and required reserves cannot be maintained. |
A Flex Alert sits alongside this ladder rather than inside it. CAISO defines it as “a call to consumers to voluntarily conserve electricity when the ISO anticipates energy supply may not meet high electricity demand.” The fact sheet says reducing use during one can prevent more dire measures, including EEA notifications, emergency procedures and rotating outages. As of September 29, 2026, flexalert.org recommended: “Set AC to 78 or higher, if health permits”. That setpoint changes over time, so check the site for the current figure.
Pet action: use the same staged approach as for ERCOT. Treat a Flex Alert like a Conservation Appeal, an EEA Watch or EEA 1 like ERCOT’s EEA 1, EEA 2 like ERCOT’s EEA 2, and either step of an EEA 3 like ERCOT’s EEA 3.
PJM and MISO: Winter Storm Fern, January 2026
Staged alerts are not only a Texas and California matter. Winter Storm Fern in late January 2026 produced them in the PJM and MISO footprints.
PJM
PJM’s January 24, 2026 filing to the U.S. Department of Energy says it issued an RTO-wide Cold Weather Alert effective 00:01 on January 24 through 23:59 on January 27, 2026, along with a Maintenance Outage Recall. It also issued a Cold Weather Advisory through January 30 and declared Conservative Operations from January 24 through January 27. The filing says PJM was projecting an all-time winter peak load of roughly 147,000 MW, and that it had been asked to provide emergency energy, in some cases up to 3,000 MW, to neighbors already in an EEA Level 2.
MISO
MISO was one of those neighbors: its report lists an emergency power purchase from PJM. MISO’s February 17, 2026 report to its Reliability Subcommittee says two Maximum Generation Events, Step 2c, were declared on January 24. That gave MISO access to generation emergency ranges, load-modifying resource curtailments, and emergency power purchases. Under its EEA 2 declaration MISO deployed about 2 GW of load-modifying resources in the North and Central regions, in addition to the self-scheduled amount, and made an emergency power purchase from PJM. A U.S. Department of Energy order about a separate Indiana generating station independently reports that MISO declared an EEA 1 and an EEA 2 “MaxGen” event for its North and Central Regions on January 24.
MISO’s Grid Conditions Explainer defines the ladder beneath those declarations:
- Conservative Operations: asks MISO members to defer, delay or recall non-essential maintenance.
- Maximum Generation Warning: alerts members that demand is increasing and operating reserves may become insufficient without operational action.
- EEA 1: declared when MISO can no longer meet projected demand and reserve requirements without intervention.
- EEA 2: takes effect as reserves keep declining and more action is needed to balance supply and demand.
- EEA 3: takes effect when supply and demand can no longer be balanced and power interruptions are imminent or already occurring.
MISO simplified its internal MaxGen steps effective June 1, 2026, to align them more clearly with NERC’s EEA levels. Confirm what each step means on MISO’s current page rather than relying on older step numbers.
Pet action (our suggested mapping, not one either operator publishes): in the PJM or MISO footprint, treat a Cold Weather Alert, a Conservative Operations declaration or a MaxGen Warning like a Conservation Appeal. Treat an EEA 1 as the first declared-emergency stage, and an EEA 2 or EEA 3 as the ERCOT and CAISO sections above describe.
Texas weatherization changes the odds, not the plan
NERC’s 2025-2026 Winter Reliability Assessment reports three separate things about ERCOT:
- ERCOT has conducted 2,028 generation and transmission service provider winter weatherization inspections since Winter 2021-2022.
- ERCOT’s probabilistic risk assessment shows a 2% probability of having to declare EEAs on the January forecast winter peak day, and a 1.8% probability of controlled load shed. ERCOT defines low-risk hours as those when the probability of an EEA is under 10%.
- Load growth from new data centers and other large industrial users is driving higher winter demand forecasts and contributing to continued risk of supply shortfalls.
NERC does not say that weatherization lowered the risk without removing it; that is our reading of these three findings. For a Texas household, the plan is neither “this cannot happen again” nor “this will happen again.” It is a low-probability, nonzero event that still justifies a charged power station and a stocked medication kit, as before 2021.
What this page does not cover
- Fire-weather shutoffs. If your own utility issues a Public Safety Power Shutoff notice, use our PSPS pet countdown protocol. It runs on the utility’s fire-weather decision, not a grid operator’s reserve math.
- Long outages. If restoration stretches past a few days once the power goes, use our weeks-long outage pet plan.
- Program enrollment. Whether your household or a pet’s medical equipment qualifies for a utility’s medical-baseline or priority-notification program is a question for your utility.
Frequently asked questions
Is a Conservation Appeal the same as an emergency alert?
No. ERCOT describes a Conservation Appeal as an elevated request to reduce energy use when there is a potential to enter emergency operations. An Energy Emergency Alert is what ERCOT calls the emergency operations themselves, starting with EEA 1 when reserves drop below 2,500 MW and are expected to stay there at least 30 minutes. A Conservation Appeal can pass with no EEA declared.
How is a grid alert different from a PSPS?
A Public Safety Power Shutoff is a utility deliberately de-energizing lines in a fire-risk area during dangerous weather. A staged grid alert is the regional grid operator saying reserves across the whole system are thin. Both can be live on the same afternoon for different reasons. Our PSPS pet countdown protocol covers the utility notices.
Does every US household have one of these alerts to watch for?
No. ERCOT issues alerts for the ERCOT grid in Texas, CAISO for the California ISO grid, PJM names a list of states and the District of Columbia, and MISO says it operates across 15 states and the Canadian province of Manitoba. Those four footprints do not add up to the whole country. If you are unsure which covers you, check your own utility's website.
What should I do when I get a grid alert, before any power goes out?
Use the window. At a Conservation Appeal or EEA 1, charge a portable power station, top off a battery-backup aquarium air pump, and pre-cool or pre-heat the room your temperature-sensitive pet uses. By EEA 2, consolidate refrigerated pet medication and confirm a backup destination. Treat EEA 3 as outages that may be imminent. Ask your veterinarian about your animal's tolerance for heat, cold or a missed dose.
Does a Flex Alert mean a rolling blackout is coming?
No. CAISO defines a Flex Alert as a call for consumers to voluntarily conserve electricity when supply may not meet high demand. CAISO's fact sheet says conserving during one can prevent more dire measures such as EEA notifications, emergency procedures and rotating outages. Rotating outages are the second step of CAISO's EEA 3.
Free checklist
Get the printable pet go-bag checklist by email
A one-page, print-ready go-bag checklist grouped by Ready.gov, ASPCA, AVMA, CDC and Red Cross categories, with a link to the full guide for per-animal quantities. One email to confirm it's you, then the checklist, the binder templates and occasional new guides. Unsubscribe any time.
Sources
We are not veterinarians, and we would rather you check these than take our word for anything. These are the sources this page relies on. For your own animal, your vet is the expert, not this page.
- ERCOT, Energy Emergency Alert 1 (EEA 1) page: the 2,500 MW and 30-minute trigger and the conservation tips. (opens in a new tab)
- ERCOT, Energy Emergency Alert 2 (EEA 2) page: the 2,000 MW and frequency trigger and the demand-response language. (opens in a new tab)
- ERCOT, Energy Emergency Alert 3 (EEA 3) page: the 1,500 MW and frequency trigger and the controlled-outage language. (opens in a new tab)
- ERCOT, Conservation Appeal page: the definition and how it differs from the EEA levels. (opens in a new tab)
- NERC, 2025-2026 Winter Reliability Assessment (November 2025), ERCOT regional section: weatherization inspection count, EEA and load-shed probabilities, and data-center demand growth. (opens in a new tab)
- PJM Interconnection, request to the U.S. Department of Energy for an emergency order under Federal Power Act Section 202(c), January 24, 2026: PJM's Cold Weather Alert, Conservative Operations declaration and emergency-energy request during Winter Storm Fern. (opens in a new tab)
- PJM, territory-served page: the list of jurisdictions PJM serves. (opens in a new tab)
- MISO, Overview of Winter Storm Fern, Reliability Subcommittee presentation, February 17, 2026: Maximum Generation Event declarations, the EEA 2 declaration, deployed load-modifying resources and the emergency power purchase from PJM. (opens in a new tab)
- MISO, Grid Conditions Explainer: MISO's definitions of Conservative Operations, Maximum Generation Warning and EEA 1, 2 and 3. (opens in a new tab)
- MISO, Max Gen Event Simplification knowledgebase article: the June 1, 2026 restructuring of MaxGen steps. (opens in a new tab)
- MISO, About MISO page: the 15-state and Manitoba footprint description. (opens in a new tab)
- U.S. Department of Energy, Order No. 202-26-46 (regarding the R.M. Schahfer Generating Station): background on MISO's January 24, 2026 EEA 1 and EEA 2 declarations. (opens in a new tab)
- CAISO, Emergency Notifications Fact Sheet (PDF, marked CommPR/08.2023): CAISO's definitions of EEA Watch, EEA 1, EEA 2, the two-step EEA 3 and the Flex Alert. (opens in a new tab)
- Flex Alert (flexalert.org), the CAISO-affiliated public conservation campaign: the thermostat recommendation. (opens in a new tab)
Related reading
Preparedness Hub
Sheltering in Place: Pets Through Power Outages
Checklist
Preparing Pets for a Public Safety Power Shutoff: Four Documents, Three Different Countdowns, and Which One Is Yours
Power Outages
When the Outage Is Measured in Weeks: The Pet Plan Your Gear Cannot Carry
Outage Math
A Watt-Hour Budget for Your Pet's Equipment: The Math, and the Four Things the Division Leaves Out
Buying Guide
Best Portable Power Stations for Pet Needs
Power Outages
What Size Generator Do I Need for My Pet's Equipment? The Arithmetic, and Where It Has to Stop